Brief

Envevo undertook its first full turnkey project for MFG, delivering an end-to-end EV charging site at the MFG Coatbridge Service Station. The scope of work included various construction and infrastructure tasks to ensure seamless operation upon handover.

Methodology

Envevo’s approach was meticulous and well-coordinated, ensuring that every aspect of the project was executed with precision. The key tasks included:

Blast Wall and Canopy Foundation Construction: Envevo constructed robust blast walls and canopy foundations to ensure safety and structural integrity. This involved careful planning and execution to meet safety standards and provide a durable foundation for the site.

1.5MVA Sub-Station Construction and Associated ICP Works: Envevo installed a 1.5MVA sub-station and handled all associated electric design and infrastructure civil works to ensure reliable power supply. This involved the design and construction of a new HV and LV network, installation of switchgear, and LV termination within the LV pillar and CT metering cabinet.

Installation of 5 x 150kW Chargers: The project included the installation of five 150kW chargers to meet growing demand for public charging needs. These chargers were strategically placed to provide easy access for users and ensure efficient charging capabilities.

11kV Connection: Envevo secured an 11kV connection from the Distribution Network Operator (DNO) which was then adopted by an Independent Distribution Network Operator (IDNO), ESP Utilities Group Ltd, who played a crucial role in the project by adopting the new electrical connection and ensuring its integration into the existing network.

13-Week Timescale: The entire project was completed within a 13-week timescale, ensuring that the site was open and operational upon handover. This required careful project management and coordination to meet the tight deadline.

Results

This site has been completed and energised on handover by Envevo.

The project was delivered with all tasks completed on schedule and to the highest standards. Envevo’s expertise and dedication ensured that the site was fully operational and ready for use upon handover. The client was extremely pleased with the quality of work and the efficiency of the project execution.

The provision of EV charging facilities has significantly benefited the local community, offering convenient and reliable charging options for electric vehicle owners in the area. The installation of five 150kW chargers has enhanced the accessibility and usability of EV charging infrastructure, promoting the adoption of electric vehicles.

The construction of an electric vehicle (EV) site is complex especially on a fuel station and it requires the expertise and dedication of a skilled team. One recent example of excellent work in this field, is an EV construction project completed by Envevo at our MFG Coatbridge site. The project was completed within budget, showcasing their commitment to delivering high-quality work.

The construction team demonstrated exceptional attention to detail and adherence to safety standards throughout the project. The whole job was methodically planned and executed, with a focus on sustainable and environmentally friendly construction practices. The result is a state-of-the-art EV site that meets the highest industry standards and provides a seamless charging experience for electric vehicle owners.

The successful completion of this project is a testament to the expertise and professionalism of Envevo and their dedication to quality and innovation has set a standard for EV site construction. Their work serves as a reference for future projects in the industry.

Andrew EdwardsMFG, Group Director - Infrastructure, HSSE & EV Project Delivery

This is a significant site for Envevo completing out first Full Turnkey Project for MFG after a longstanding relationship to this point. The increased scope of civils and demolition works is a demonstration of the company’s progress too now. We worked extremely close with the architectural consultant and client to ensure we delivered the site to spec with a quality finish. This also ran alongside us completing the connection works to open the site with live working chargers.

Taylor McGinnigleOperations Manager